reference object
City: Hamburg
Year of settlement: 2009
Details:

Basically, a still largely intact building fabric, which was erected shortly after the war, presented itself here. For the existing commercial use, however, there was no possibility of an appropriate current utilisation. In addition, the energy standards were no longer up to date. The selling price was positively influenced by the option of a higher structural utilization. Townhouses are to be built here in future. A price of approximately € 600,-/ m² living space was paid. The costs of franking had to be taken into account in the pricing.



Housing estate with run-down building fabric

If you have any questions or require further information, please contact us:
★ Contact Us